-->

Schneider Electric
Featured

09 July 2020

Solution from rack to row to room to building of power, cooling, racks, security and DCIM are conceived and tested as part of an integrated system

Small data centers and network rooms vary dramatically in regard to the amount of uninterruptible power supply (UPS) runtime commonly deployed. This paper describes a rational framework for establishing backup time requirements. Tradeoffs between supplemental UPS batteries and standby generators are discussed, including a total cost of ownership (TCO) analysis to help identify which solution makes the most economic sense. The analysis illustrates that the runtime at which generators become more cost effective than batteries varies dramatically with kW and ranges from approximately 20 minutes to over 10 hours

 

 

Client3
Atba2
Client9
Client2
NIH
Pms
Lilly
Client10
Water
EIMC
Egyptian Air
Usp
Badr
Foad
Bshay
Client4
Hassan
Khalda
Ntra
Wady
Tal3at
Amal
Amon
Client1
Asar
Rashed
Air
Orascom
Client6
Egyptian
Nile
Swiss
Cairo Oil
Zietco
Client11
Client7
Client8
Elbrince
Client12
Client5
  • Building 14, Road 298, New Maadi, Cairo, Egypt.
  • +20 270 32334 | +20 270 32335
  • +20 27032225
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Find us

Like us

Contact us

Request a Call