-->

Schneider Electric
Featured

09 July 2020

Solution from rack to row to room to building of power, cooling, racks, security and DCIM are conceived and tested as part of an integrated system

Small data centers and network rooms vary dramatically in regard to the amount of uninterruptible power supply (UPS) runtime commonly deployed. This paper describes a rational framework for establishing backup time requirements. Tradeoffs between supplemental UPS batteries and standby generators are discussed, including a total cost of ownership (TCO) analysis to help identify which solution makes the most economic sense. The analysis illustrates that the runtime at which generators become more cost effective than batteries varies dramatically with kW and ranges from approximately 20 minutes to over 10 hours

 

 

Client1
Client4
Lilly
Usp
Foad
Swiss
Khalda
NIH
Cairo Oil
EIMC
Egyptian Air
Atba2
Amon
Pms
Nile
Water
Air
Client6
Client8
Client5
Client3
Bshay
Client2
Zietco
Client12
Wady
Rashed
Elbrince
Asar
Client11
Hassan
Client7
Orascom
Egyptian
Amal
Tal3at
Ntra
Client9
Badr
Client10
  • Building 14, Road 298, New Maadi, Cairo, Egypt.
  • +20 270 32334 | +20 270 32335
  • +20 27032225
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Find us

Like us

Contact us

Request a Call