-->

Schneider Electric
Featured

09 July 2020

Solution from rack to row to room to building of power, cooling, racks, security and DCIM are conceived and tested as part of an integrated system

Small data centers and network rooms vary dramatically in regard to the amount of uninterruptible power supply (UPS) runtime commonly deployed. This paper describes a rational framework for establishing backup time requirements. Tradeoffs between supplemental UPS batteries and standby generators are discussed, including a total cost of ownership (TCO) analysis to help identify which solution makes the most economic sense. The analysis illustrates that the runtime at which generators become more cost effective than batteries varies dramatically with kW and ranges from approximately 20 minutes to over 10 hours

 

 

Client4
Client3
Rashed
Egyptian Air
Egyptian
Hassan
Wady
Client11
Elbrince
Khalda
NIH
Usp
Client9
Foad
Orascom
Nile
Asar
Client1
Client10
Ntra
Lilly
Amon
Client6
Water
Pms
Client7
Client2
EIMC
Bshay
Cairo Oil
Amal
Air
Tal3at
Swiss
Zietco
Client8
Badr
Atba2
Client5
Client12
  • Building 14, Road 298, New Maadi, Cairo, Egypt.
  • +20 270 32334 | +20 270 32335
  • +20 27032225
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Find us

Like us

Contact us

Request a Call