-->

Schneider Electric
Featured

09 July 2020

Solution from rack to row to room to building of power, cooling, racks, security and DCIM are conceived and tested as part of an integrated system

Small data centers and network rooms vary dramatically in regard to the amount of uninterruptible power supply (UPS) runtime commonly deployed. This paper describes a rational framework for establishing backup time requirements. Tradeoffs between supplemental UPS batteries and standby generators are discussed, including a total cost of ownership (TCO) analysis to help identify which solution makes the most economic sense. The analysis illustrates that the runtime at which generators become more cost effective than batteries varies dramatically with kW and ranges from approximately 20 minutes to over 10 hours

 

 

NIH
Client7
Rashed
Client4
Client3
Client6
Cairo Oil
Ntra
Client9
Pms
Swiss
Nile
Hassan
Air
Zietco
Client2
Client10
Client8
Egyptian
Wady
Tal3at
Water
Client11
Client12
Atba2
Egyptian Air
EIMC
Lilly
Orascom
Client5
Client1
Elbrince
Usp
Khalda
Asar
Amon
Foad
Bshay
Badr
Amal
  • Building 14, Road 298, New Maadi, Cairo, Egypt.
  • +20 270 32334 | +20 270 32335
  • +20 27032225
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Find us

Like us

Contact us

Request a Call