-->

Schneider Electric
Featured

09 July 2020

Solution from rack to row to room to building of power, cooling, racks, security and DCIM are conceived and tested as part of an integrated system

Small data centers and network rooms vary dramatically in regard to the amount of uninterruptible power supply (UPS) runtime commonly deployed. This paper describes a rational framework for establishing backup time requirements. Tradeoffs between supplemental UPS batteries and standby generators are discussed, including a total cost of ownership (TCO) analysis to help identify which solution makes the most economic sense. The analysis illustrates that the runtime at which generators become more cost effective than batteries varies dramatically with kW and ranges from approximately 20 minutes to over 10 hours

 

 

Client4
Zietco
Client8
Client11
Tal3at
Client7
Client10
Wady
Client2
Orascom
Foad
Hassan
Air
Atba2
Khalda
Bshay
Badr
Elbrince
Water
Client3
Client6
Amon
Client1
Amal
Lilly
Cairo Oil
Egyptian Air
Usp
Rashed
Client5
Nile
Ntra
Client9
Client12
Asar
Pms
EIMC
Egyptian
NIH
Swiss
  • Building 14, Road 298, New Maadi, Cairo, Egypt.
  • +20 270 32334 | +20 270 32335
  • +20 27032225
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Find us

Like us

Contact us

Request a Call