-->

Schneider Electric
Featured

09 July 2020

Solution from rack to row to room to building of power, cooling, racks, security and DCIM are conceived and tested as part of an integrated system

Small data centers and network rooms vary dramatically in regard to the amount of uninterruptible power supply (UPS) runtime commonly deployed. This paper describes a rational framework for establishing backup time requirements. Tradeoffs between supplemental UPS batteries and standby generators are discussed, including a total cost of ownership (TCO) analysis to help identify which solution makes the most economic sense. The analysis illustrates that the runtime at which generators become more cost effective than batteries varies dramatically with kW and ranges from approximately 20 minutes to over 10 hours

 

 

Badr
Khalda
Bshay
Client3
Client1
Asar
Atba2
Amon
Hassan
EIMC
Cairo Oil
NIH
Foad
Tal3at
Orascom
Client5
Nile
Client12
Rashed
Client6
Air
Client10
Amal
Usp
Egyptian Air
Client2
Client11
Wady
Ntra
Swiss
Lilly
Pms
Client9
Egyptian
Client4
Client7
Water
Zietco
Elbrince
Client8
  • Building 14, Road 298, New Maadi, Cairo, Egypt.
  • +20 270 32334 | +20 270 32335
  • +20 27032225
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Find us

Like us

Contact us

Request a Call